Wednesday, August 11, 2010

Riders on the Storm - Grande Finale

After reaching 1380 from the entrance in Polldeelin rising I felt that I missed the connection point. It seemed to me that trying to forge the connection from the Polltoophill Sink should be easier as in 2009 I left the end of the line in an open passage, 1070m from the entrance. Six eventfull dive over July and August finally resulted in the connection between Polltoophill in Castletown and it's resurgence Polldeelin in Kiltartan. After 2.5 year and 45 dives from both sides the Riders on the Storm Traverse was completed - 2.4km in length with an average depth between 40-45m and max. -62m. Here are the log entries.

08.07.11
Extremely dry. River bed dry, no flow into Polltoophill, most of he river sinking into the Castle Sink. Line repair dive. The lines severely damaged , all over the cave. Retreat after 1h when diver accidently cuts himself off the main line and loose the mojo for the day. Runtime 1.5h.

11.07.10
Further line repairs, breakages every 30-40m. On the top of that, as my nemesis , the line from an abandon lead from 2008 got entangled with 2009 line making things even more complicated. I spent a lot of time at -40m trying to sort it out but in the end I couldnt find the continuation of the way on. Again a lot of line cutting and tying, all in low vis due to lack of the flow, a lot of second thoughts as well, a courage to continue was sinking as a proverbial stone... The weather was extremely dry and there was no indication whatsoever from the current. I needed to go back to my 'riders on the storm' strategy' – waiting for the rain. Runtime 2.5h.

21.07.10 POLLTOOPHILL SIEGE

Day 1
It rained a bit over the last few days, all right , but nothing really major. Arriving to Castletown I expected some decent flow. Surprisingly there was a LOT of water flowing into the sink, I was standing by the swollen river thinking WTF...?! Anyway at that stage I thought the water level was dropping but just in case I put a stick into the river bed, marked the water level and started preparing the equipment. 3 hours later whe everything was ready I went down to check the level and ...it rose by one inch! I decided to camp and wait till the next day.
Day 2
Water levels still rising despite a lack of rain. A trip around Coole Lough, investigating its sinks and risings. Back to Polltoophill in the evening the water level seemed to stabilise. I decided to wait. Siege tactic.
Day 3
Water levels were monitored through the night and proved to be dropping slowly but the current was still extremely high. The dive was postponed for one more day. A trip along Castletown river – Pouloonogue doline located revealing a very promising underwater cave , a lot of water flowing from at the bottom of 8m cliff, coming from the east.
Day 4
The calls from friends from Dublin worrying about my mental helth became more frequent which forced a decision to give it a go. Extra ropes were installed at the surface in case I would need to pull myself out from the cave. The flow at the surface very strong. I carefully started working my way down, at the beginning the suction under the water didnt seem that strong but I knew it could be very deceptive – it's full strength was usually thrown at the diver on his way back. At -9 metres I replaced a short section of the 8mm guideline which seemed to be very weak. At -16m where a low roof starts the flow increased rapidly. I passed that slowly to -21m and there I stopped, wondering what next. The worst section, with the strongest flow was behind me and I was still in control but I realised that if I continued and got rebreather failure no amount of open circuit bailout would get me back. So I decided to abort and return to the surface. Easy to say. There you could do only a one thing – to pull yourself along the line ( In 2009, when I applied the 'riding on the storm' tactic I put 8mm one down to -21m). Extremely hard work, at some point my breathing was so heave I was about to bailout. The rest of the day I spent poking around in Ballylee area which resulted in discovering a new, deep and important underwater cave – Pollindre.
Day 5
A further drop in the water level and I decide to have another go. This time more succesfull. Following an indicative flow of the river I quickly located the way to the section found in 2009 and after repairing another section of broken line I returned to the base. I didn't expect any more line breakages, the stage was ready for a push dive.
01.08.10
Planned as a push or even a connection dive. As I expected I quickly get into the section discovered in 2009 where the passage started gradually descending below -50m. There the line was broken again and I had to lay over 150m of the fresh one mostly at the depth of -60m. At -62m i came accross my line from 2009 , I tied in and continued, still in 60s. Suddenly and out of nowhere a quite substantial leak developped somewhere at my left hand side. I tried to locate it but it was very difficult to chack anything with the amount of the gear I was wearing. After a systematic check I ruled out the leak from the scuba cylinders so it must have been rebreather. I couldnt ignore it and continue, the dive had to be aborted... Once I got back to -40s on my way out I fugure out the source of the leak – the automatic diluent valve. I separeted it but unfortunately there was no way I could attack the end of the line again, I already spent a lot of time at -60m and a lengthy decompression was due. Runtime 4.5h.

07.08.10.

The Connection

Yet another try. Got to -60s without any troubles, continued on that depth for a while untill the passage stated ascending. Surprisingly there was another line breakage there but I regained my line from 2009 after 20m or so. Kept ascending and around -23m I expected to see a big steel reel to which I anchored the line a year ago. However the end of the line was loose, wrapped around some small boulder. I attached a new reel and started laying a new line into the unknown. The passage wasn't even nearly as silty as I remembered, the slope was also very gentle, almost unnoticable. The passage raised to -19m with no sign of any mudbanks and then started descending again over a flat , well washed floor. Soon I was back to -30m and the theory about the connection point in the big mudbank area faded away. But I was still following a noticable flow so I knew I was on a good track.
After a while at 30s a line from the reel run out but this time I was prepared and reached for another 150m reel clipped to my hip Dring, tied the knot and continued interrupted in a rather pleasant passage. Suddenly the floor fell away and I stopped on the brink of some vertical drop. I made a belay and dropped down landing on a floor few metres lower. While making anothe belay at the bottom I felt that my leg cought something. First I thought it was a tree branch but I turned around and saw a relatively fresh 4mm line. I was constantly following the flow this year so there was no way it could be a Polltoophill line and this summer I was using only a 6mm while in there. So I knew straight away I made a connection with Polldeelin, after 2.5 years and 45 dives from both sides... I tied in and proceeded for a short distant along the line untill I met a marking – it was the section of the line from my last Polldeelin dive on 16th of June. This section hasn't been survey yet but the connection was somewhere 1200m from the Polldeelin entrance and with a similar distance from the Polltoophill the Riders on the Storm Traverse was 2.4km long. Yet, to my surprise the moment of making the connection was very different from what I imagined... No euphory or deep self-content or satisfaction. Instead I felt ...sad, I guess sad because it was over. It took me completely by surprised for on a many occasions I expressed a wish the Traverse was already completed...I guess Wild was right saying that there are only two tragedies in life: one is not getting what one wants and the other is getting it...;-) But hey, the project is far from the end , there are ongoing leads in the system which is now 2.8km long, and who knows where do they go. There's only one way to find it out, to dive there again.
Return was slow and tiring, on my way out I collected all the cylinders that secured my dive (5x 11l, one 12l, one 7l and one 5.7l) and I surfaced at 3 am after runtime of 6.5h. I made a camp fire, prepared a late diner/early breakfast and hit the sleeping mat at 5am.

Monday, June 28, 2010

Riders on the Storm - After the Flood


16.06.2010

Repairing the lines damaged in the 2009 flood. Not as much damaged as hoplessely burried underneath thick layers of fine gravel, sometimes more than 0.5m deep. 

Runtime 1.5h


17.06.2010
Further  line repairs. Around 800m mark I started looking for the continuation of the way on, which at the time I thought would be before the end of my line from 2008 at 850m. With breathing becoming more and more difficult from the unit (seemed like it was getting flooded) I decided to abort the dive before the search was completed, I bailed out and started the return. I was a bit anxious wheather I had enough of gas as it was my first serious bailout that far inside the cave but it proved I had plenty: before I reached my 6m stop I used 200b from one Alu 80 and 150b from another, leaving 2 Alu 80 untouched. I tried to go back on the unit during my last stop and I managed to finish it breathing carefully in some rather vertical position and flushing the loop often with 02. When I open the unit on the surface the canister was 1/3 filled with water and all sofnalime well soaked. Runtime 3h


19.06.2010

I was back two days later and after some epic search at the end of the line I finally found the way on – after two years and 4 dives to the end of the line.  What happened is that the passage at the  previous limit of exploration (850m)gradually turned north and closed down in a very silty and low alcove. It was very confusing as the Polltoophill was somewhere to the south or south east so I thought I must have gone wrong somewhere before that point. So I kept searching  and thoroughly inspecting the passage between 800 -850m.  With no more incidents with flooded unit I completed the investigation of the right hand wall but it didn't reveal any side passage or junction. Then i attatch a 30m search reel that I brought especially with me on this dive to the end of the line and jumped off to the left to investigate a left hand wall.I expected  it to be a maximum three metres away but I found it suspiciously further - five, perhaps six metres away. I moved a couple of metres south keeping the wall at my right hand side.At first I thought I was going back upstream but deep silt and solid 1m undisturbed vis suggested that I hadn't passed that route yet. I did some zig zagging  and after not finding any line in the passage I realised I found the way on.

Now, looking at the sketch you must be thinking that I must be some sort of half idiot if I needed so much time and  so many dives to find the continuation but keep in mind that with 1m  visibility which is usually quickly down to 10-20cm after only a short presence in the passage filled with a soft silt things look, or 'feel' I should rather say, very different. 

From the 'breakthrough point' the silty passage continued soutwards for another 200m at the depth between 30 and 40m and I tied off the line at 1070m from the entrance.Runtime 4.5h


26.06.2010
I continued from my previous end of the line and after a while I arrived to a huge mudbank with a very steep slope of 60 plus degree. I secure the line at the bottom of the slope with a siltscrew and carefully started my way up. At the top, at merely -20m or less the ceiling of the cave was very low and  I was moving on with a great care and difficulty using the siltscrews frequently as the passage was passable only in certain places. Viz was deteriorating very quickly. I was absolutely convinced that I was only metres from the connection with my 2009 Polltoophill line, somewhere on the other side of that mudbank. Suddenly he ceiling got lower but at the same time I felt that the floor of the mud bank descended steeply. Vis was next to none anyway so I turned my body around and went fin first as it was quite tight,  laying the line behind me. After few metres when the passage got bigger I turned around again. I moved ahead of a mud cloud which was now quickly rolling down the slope  and with a heart beat rate hitting through the roof I started sweeping the passage with my torch beam from one side to another in search  of my reel from Polltoophill. But there was only mud covering all he floor. The passage kept descending and at -30 I  knew for sure  it wasn't the right spot. Moreover the passage direction turned to NE and I had an impression that from some time I was moving with a slight current. No good. I went on on a depth of -40m  untill my line run out 1380m from the entrance. .I felt I must have missed the connection point but the question was where. My bet was the the top of the big mud bank. Maybe there was an other ascending passage from the top of the mudbank, that I simply missed in 0 vis. It would made sense given the fact that my EOL in Polltoophil was in an ascending passage at -23m of depth. It was time to go back to Castletown. Runtime 5.5h


Monday, September 29, 2008

RIDERS ON THE STORM SEPTEMBER 2008

27.09.2008

Set up dive, just to drop 02 and EAN 50 cylinders but finally I spent there over 1h repairing line after two months of flooding

28.09.2008

Diving with new configuration in Polldeelin -twin plus 4 alu 80. Cave was very dark and at least twice I had very serious thoughts to turn the dive. Nevertheless I decided to carry on but slowly and carefully. I reach my EOL  in 63min, I stayed there for another 17min but I managed to add only 55m of new line; end must be now around 830m. Runtime 200min.That could have been last dive in Polldeelin this year, I don't know if there's any point to go  there back in that kind of conditions.




Friday, August 29, 2008

RIDERS ON THE STORM JULY - AUGUST 2008

13.07.2008
I returned after two months on 13th July. I was deliberatly waiting for some wet conditions as I need some flow indication to find the way on. Maybe conditions were slightly too wet on last Sunday...
I took off late afternoon with 2x15 Twinset and three aluminium 11l stage cylinders determined to find the way on. Visibility 1m flow at the mouth of the cave v. strong - I was moving on like elephant. When I arrived to -43m I was 15minutes late comparing to my runtime in dry weather. Finally I reached my reel well burried in the silt but unfortunatelly there was no visible flow at the end of the line. Vis went bad very quickly, I let too much line to get off the reel and with twin set and two stages I became perfect target for line entanglement. I focused on sorting the line and in my head I have already decided to turn the dive. When the line was sorted and me ready to go back I suddenly noticed some sort of flow coming from my left hand side. I looked at my computer I was suppose to turn now according to my basic plan but...I had a second plan I made in case of some progress and plenty of gas in Four tanks I had with me ( I dropped only 1 stage on the way, 02 and deco50% were staged on 6 and 21m). So I started swimming against that flow which was becoming more and more apparent. Suddenly I stopped confused - particles of silt in the water were indicating that it comes from underneath of me...With no better option but following that indication I dropped down and after 3-4 m I landed on the bottom of a clean passage. Flow was now very helpful so I secure the line and started swimming against. I checked bearings - SE - f... perfect! I finished my reel and tied off the line 730m into the cave, Passage was still going straight on 34-36m. I was back on the surface after 185min, tired but happy

02.08.2008
I started new reel from EOL, passage still nice, straight, after 40m I met big boulder. I passed it on my right and continued. After another ~30m passage started going NE, I stopped and realised I was swimming with the flow...  b****cks ! ( it's not great direction when you explore upstream..Wink. I reel the line back to the point where I was still against the flow. That big boulder must have been actually a junction and the way on was on its right. As I reached my thirds I cut off the line and turn the dive. EOL 770m.

Since that trip continuous raining made any diving there impossible ( even for such a cowboy like me;)

Sunday, May 11, 2008

RIDERS ON THE STORM MAY 2008

03.05.2008

Divers: Jonathan White, Jim Warny, Artur Conrad


Jim and me we were diving on trimix and Jonathan just came back from his MOD2 on Kiss in Malin Head. It was a while since the last time he was in the cave so he decided take it easy exploration wise and brought his impressive photographic equipment. Quickly he has learned new rule of thumb in Irish cave diving - Never dive shortly after me!
But as I was diving first ( lucky me!) I enjoyed good 2m visibility enhanced by the beam of my new 7LEDs DragonSub ;-P As I was swimming along the section lined by Jim on the previous weekend I had impression that he must have really enjoyed his nitrogen narcosis but after checking the bearings I had to pay respect to him, line was going SE, exactly where we wanted to go. Nevertheless that section of passage was gradually going up with some deeper canal left on my right hand side. I reached the reel left by Jim and kept going on. Shortly I have been forced to find the way among the boulders, a bit similar situation as we experienced after 400m. When my reel was almost empty i got to tight section on -37m and around 610 into the cave. Suspecting that that was dead end I left the reel in place, returned 25m toward the entrance and started new search with second reel. After some zigzagging among the boulders I came across my own line apparently creating some 'interesting loop' and disappointed I started my return. Dive time 2h. On last deco I enjoyed Jean Michel Jarre on my UW MP3 Player
After short discussion on the surface Jim went down for another 2h ( Dire Straits on deco but same as me he came back without conclusion. Enthusiasm from last week vanished completely.

05.05.2008
Determined not to let The Polldeelin project fall into stagnation phase I felt obliged to dive it as soon as possible. Not being able to refill my tanks in the area I headed to Mayo for some other project but I was back next evening dropping my refilled stages and deco tanks into the river. The dive took place next day in the morning. There's not much good things I can say about my preparedness to that dive when it comes down to equipment. I left one of my o2 clean regs in Mayo so I had to share one reg between three tanks - one with travel EAN32 and two others with O2 for deco. Apart of that all my tanks were pumped to far lower pressure that I asked for...but this is Ireland and I can only blame myself for not checking the pressure on the collection...Finally, after lot of troubles down there I returned to the surface after 140min with 5 tanks drained to 0 B ( both stages used in early part of deco, both o2 deco, suit inflation tank). Last 75 min I spent closing and opening tank valve with every breath since the regulator that had to serve 3 tanks decided to freeflow...I still had 3000l of back gas in my twin but 24/20 is not a great deco mix...Shambles...
The only good thing is that I think I found the way on ( actually it seems we have never lost it) only meter away to the right from the end of the line... However further dive is needed to confirm this.

10.05.2008
I got to the end of the line, the only possible way on seemed to be going SW along left hand side wall on the depth of 40m.However it started turning gradually, I was still fine when it was going W but after it took NW direction I reeled the line back to the point where I spotted some opportunity to jump off toward South. I follow this way for about 15m in bad bad visibility going up along some gentle slope with boulders untill I hit the roof..great..again I left my half full reel in place and turned back.
After that dive I payed more attention to Pooltoophil, Pollonora and Pollatoomary projects.

Monday, April 28, 2008

RIDERS ON THE STORM APRIL 2008

26.04.2008

Divers: Jim Warny, Artur Conrad


On Saturday Jim dived first. After reaching the point where I tied off the line on -19m he went up to -15 until the passage which turned out to be kind of crevasse started closing up. He came back to -19m and noticed some possible although not very promising way on leading down. He tried to follow it but got badly entangled in the line and had to remove the bailout to free himself. I imagine that vis by this time has reduced to zero ( very silty area). He returned after 1.5h and wasn't very enthusiastic about what he found. Neither was I. Getting into the water I had a vision of myself crawling through the silt in blackout in hopeless attempt to find the continuation...
At the EOL, taking advantage of reasonably good visibility I realised that way down described by Jim is actually quite comfortable and steeply drops over thick silt covered floor. After a while and to my amazement I reached silt free floor on the depth of 38m